The failures we design against
Willow baskets fail in predictable ways: mould in the container, cracked rims, liners that shrink, handles that pull through. Each has a control point before the carton is sealed.
Control points
| Stage | What we check |
|---|---|
| Raw material | Rod grade and flexibility; rejection of brittle or discoloured bundles before soaking. |
| Weaving | Weave density against the approved sample; rim binding tightness; handle anchor points. |
| Drying | Moisture content measured before staining — the single biggest cause of mould claims. |
| Stain and seal | Colour match under daylight, coverage on the underside, no drips on the weave. |
| Lining | Stitch density, seam allowance, fit after washing, drawstring or hook attachment. |
| Final | AQL sampling on the packed carton, plus drop test on the outer. |
Third-party inspection welcome
We are comfortable with SGS, BV, TÜV or your own QC team on site before loading. Tell us the inspection date when you place the order and we will schedule production so there is something finished to look at.
Photographs at each checkpoint are sent without being asked, because a buyer nine time zones away should not have to chase for proof that weaving has started.

Documentation
Available on request — TO ADD marks the documents we still need copies of.
Factory audit
TO ADD BSCI / Sedex / other social audit report
Quality system
TO ADD ISO 9001 certificate
Material origin
TO ADD FSC or plantation source declaration
If your compliance team needs a specific document before we can be added to your supplier list, ask — we would rather find out now than at the purchase order.